Frequently Asked Questions

I want to have an elevator built, what is the price?
 
Elevators do not have a fixed and specific price. It varies according to the characteristics of the building and the elevator to be built
 
A new design and pricing can be made according to the characteristics of the building class, capacity, speed, door type, etc. of the elevator and after this design, pricing can be done.
 
How can I determine the number of elevators and their features that will determine the exact needs of my building?
 
During your project, an Elevator Traffic Calculation must be made in accordance with the usage area and number of floors of your building. This process will be clear after an Elevator Project is drawn in accordance with the Elevator Traffic Calculation. Preliminary projects must be drawn by an engineer with an authorized SMM certificate on Elevators by elevator companies or Electrical and Mechanical Project offices.
 
What should be the height of the Dome Concrete in the Elevator Machine Room?
 
The height of the dome concrete from the machine room floor is not standard. The correct reference here is not the machine room floor.
 
It must be 3700 mm from the ground level of the last floor where the elevator will go. Therefore, it may vary according to the floor height of your project.
 
This distance may vary for elevators with different speeds and capacities. You can always reach us from the dimensions section of our page for the correct measurement
 
What should be the depth of the elevator shaft bottom?
 
The depth of the elevator shaft bottom should not be less than 1400 mm according to the standard. You can reach this measurement, which varies according to speed and capacity, from the dimensions section of our page. In home elevators, solutions can be produced even in 200 mm thanks to special systems, but you should definitely contact our company for these special solutions
 
At what stage of the construction should an agreement be made with the elevator company?
 
After the rough construction is completed, when the plastering starts, it will be the right time to make an agreement with the elevator company. Plastering and coating works on the edges of the elevator doors on the landings will not work unless the assembly is done and the flow of your work will slow down.
 
How many months will it take to complete the assembly of the elevator after the agreement is made?
 
The completion of the elevator is approximately 3 months according to our contract period. The manufacturing and supply process in factories is much more than the assembly of the elevator in the construction. However, it should not be forgotten that the completion of the elevator is directly proportional to the completion of the building.
 
Unless door edge modifications and landing coatings are done, the elevator installation cannot be completed. As an elevator company, we are the last team to leave your building. While fine cleaning operations are carried out, the elevator's final adjustments and cleanings are also carried out.
 
When does the warranty period start?
 
After the elevator installation is completed and its license is obtained, the warranty period starts when the elevator is given to service. The time between obtaining the license and giving it to service can be a long time. The elevator is not operated during this period. When the management is formed in the building and the Maintenance Agreement is signed, the warranty period starts from the moment the elevator is delivered to the building management, that is, the end users, after a final cleaning and adjustments are made.
 
Is it possible to operate the elevator with construction site electricity?
 
Yes, it is possible, but it is risky. All malfunctions that occur during use with construction site electricity are under warranty and are the responsibility of the person who keeps it open for use. However, it is legally forbidden to operate the elevator without connecting electricity from TEK.
 
What is the workflow plan for elevator installation?
 
After the agreement is made, the projects are drawn after the survey is taken and the rail door assembly is done in the first stage. If the construction of the machine room is completed, the machine engine assembly can also be done. After these processes are completed, the assembly is interrupted for the rough construction and renovation works. After the door edge renovations and landing flooring are completed, the cabin table installation and processes, which we call fine works, are continued.